How we work
Experience Unmatched Quality and Exceptional Results
At our service, we take pride in delivering exceptional quality and unmatched results to our clients in Cape Cod. With years of experience and a team of highly skilled professionals, we are dedicated to delivering custom solutions that meet our clients' unique needs.
The exact stages of a kitchen countertop renovation may vary depending on the specific project and the materials used, but these are general steps involved.
![](https://capecodcounterworks.com/wp-content/uploads/2023/04/cape-code-counter-works-img-18.png)
Planning & Designing
Visit our showroom or get an estimate virtually. Materials needed in order to provide quote would be, giving a plan or drawing (for estimate purposes only)
![](https://capecodcounterworks.com/wp-content/uploads/2023/04/cape-code-counter-works-img-19.png)
Scheduling Template
Once color is determined, selected & deposit and sign-off are given, we schedule a template for CCCW to come out to site and conduct a field measure.
![](https://capecodcounterworks.com/wp-content/uploads/2023/04/cape-code-counter-works-img-20.png)
Ripout / Removals
This is required for the customer to allocate their own plumber for the day of installation, we Ripout & Install on the same day. The plumber is responsible for the removal of existing faucets and hardware, shutting off water at sink, disconnecting gas range, and or downdrafts.
![](https://capecodcounterworks.com/wp-content/uploads/2023/04/cape-code-counter-works-img-21.png)
Template Sign Off
If you are a new build or if there is no countertop to remove - after the template is completed we need the customer to sign off on the template. This also includes providing all materials we needed at template as in, faucet, sink and cooktop or range specs. If these items were not present at the time of template, the customer is responsible for giving us access to said items in order to move forward with fabrication. PROJECT WILL BE ON HOLD UNTIL ITEMS ARE RECEIVED
![](https://capecodcounterworks.com/wp-content/uploads/2023/04/cape-code-counter-works-img-22.png)
Fabrication / Install
The fabrication process can take anywhere from 7-10 business days, depending on season, to 10-20 business days. Once fabrication is complete, we will then schedule an installation date. This stage will then complete your project timeline. Final payments are processed and should be completed within 7 days of the completion of your project.